WORLDWIDE SHIPPING!  OPENING HOURS: MON - SAT 10AM to 4.30PM / 10AM to 4PM SUN & Bank Holidays
Choose a category...
Welcome to Kernow Model Rail Centre  /   Call our team on 01209 714099 for all enquiries & orders  /   Post Free UK Orders over £250. More details >>>

0 x item(s)

15 selected products
  • 38-052A WSL Bachmann MTA Open Wagon EWS [WL]
  • 477 Ratio LNWR Square Post Signals Kit
  • C4534 Scalextric Rover SD1 - 1983 BTCC - Steve Soper
  • 42-570 Graham Farish Scenecraft Quayside Corners
  • 374-561B Graham Farish GWR Hawksworth Composite Corridor
  • NSHL03WF Oxford Diecast Scania Highline Walking Floor A W Jenkin
  • PC591 Parkside SR 12 Ton Box Van kit uneven sides Ratio 591
  • C4512 Scalextric Cadillac V-Series R. - 24 Hours of LeMans 2023
  • C4500 Scalextric Lamborghini Countach - Green
  • 32-704SF Bachmann Class 46 Sealed Beam Headlights 46 045
  • NXF005 Oxford Diecast Jaguar XF Polaris White
  • C4525 Scalextric Plymouth Barracuda - Spa Summer Classic 2023
  • GVNEM05 Golden Valley Hobbies Conversion NEM Pockets
  • 180440 Faller Parasols
  • R4888C WSL Hornby SR Bulleid 59ft Corridor Brake 3rd Coach S2860
R4888C Hornby SR Bulleid 59ft Corridor Brake Third Coach number S2860S in BR Green livery R4888C Hornby SR Bulleid 59ft Corridor Brake Third Coach number S2860S in BR Green livery
Click an image to enlarge.

R4888C WSL Hornby SR Bulleid 59ft Corridor Brake 3rd Coach S2860

Add To Comparison

R4888C Hornby SR Bulleid 59ft Corridor Brake Third Coach number S2860S in BR Green livery - Era 4
Set 972

When Oliver Bulleid took over as Chief Mechanical Officer of the Southern Railway following Richard Maunsell's retirement, the General Manager and Board were already aware that the SR's mainline coaching stock lagged behind the standards set by the other three Railway companies.

In 1938, with the assistance of his Technical Assistant, L. Lynes, Bulleid began design work for new steam-hauled stock for the Bournemouth and Weymouth services, placing the order for fifty-four 57' 11" underframes with Lancing Works. With the onset of the Second World War, the supply of bodies for these was put on hold and it was not until 1944 before the orders for the bodies could be placed, the first of these being finished at Eastleigh Works in November 1945.

Featuring a smooth, continuously curved bodyside, with small fixed windows above the door windows, the exterior was distinctly Bulleid in character and was a perfect match for his streamlined Pacifics and Light Pacifics. However, the interim nature of the design was apparent in the retention of Maunsell's underframe and layout, with side doors providing access to each compartment. Two types of stock were built; a Composite of four First, and three Third Class compartments to Diag. 2316 and a Brake Third of five compartments, with a 22' long brake van to Diag, 2121.

The last coaches were withdrawn in July 1967, at the end of Southern steam. The first withdrawals started in December 1963, leaving just Sets 964/967/968/976 and 980 until 1965, when further withdrawals left just twenty loose coaches.

Name:
R4888C WSL Hornby SR Bulleid 59ft Corridor Brake 3rd Coach S2860
Gauge:
OO Gauge
Price:
£ 17.99 Saving £40.50 (69.24%) on RRP (£58.49)
Product Code:
KLR001
Availability:
In Stock - usually despatched within 24 hours
Stock Level:
110
Brands
None Deliverable