WORLDWIDE SHIPPING!  OPENING HOURS: MON - SAT 10AM to 4.30PM / 10AM to 4PM SUN & Bank Holidays
Choose a category...
Welcome to Kernow Model Rail Centre  /   Call our team on 01209 714099 for all enquiries & orders  /   Post Free UK Orders over £250. More details >>>

0 x item(s)

11 selected products
  • R172 Hornby Distant Signal
  • C8207 Scalextric Half Straight 175mm x 2
  • 23-179 Kato Unitrack Opposite Platform B
  • C4712 Scalextric Brabham BT26A - 1970 South African GP - Peter D
  • 42-552 Graham Farish Scenecraft Ballast Loads for 4 Wheel Wagons
  • K9008 BR Arrows as applied to 4-TC units (Pack of 4)
  • R40166B Hornby Mk4 Open Standard Coach C number 12444 GNER
  • 5137 Model Scene 1927 Maudslay ML3 Bus kit
  • PN150 Metcalfe Manor Farm kit
  • R40477 Hornby LNER West Riding Limited Brake Third & Kitchen Thi
  • NR214 Peco Containers LNER Furniture removals (pack of 2)
R40477 Hornby LNER West Riding Limited Brake Third & Kitchen Third Articulated Coach pack R40477 Hornby LNER West Riding Limited Brake Third & Kitchen Third Articulated Coach pack R40477 Hornby LNER West Riding Limited Brake Third & Kitchen Third Articulated Coach pack R40477 Hornby LNER West Riding Limited Brake Third & Kitchen Third Articulated Coach pack R40477 Hornby LNER West Riding Limited Brake Third & Kitchen Third Articulated Coach pack
Click an image to enlarge.

R40477 Hornby LNER West Riding Limited Brake Third & Kitchen Thi

Add To Comparison

R40477 Hornby LNER West Riding Limited Brake Third & Kitchen Third Articulated Coach pack

Following the success of the LNER’s newly-introduced ‘Coronation’ trains in 1935, a new train was introduced to operate between London King’s Cross and Leeds and Bradford in 1937.

A new set of carriages was built that was identical to the ‘Coronation’ with four twin articulated coaches, though not the streamlined beavertail observation car, and named the ‘West Riding Limited’. Carriages were in pairs, sharing a bogie between the two, thus reducing friction and improving ride quality.

The train first ran on 27th September 1937 and achieved an average speed of 63.3mph (101.9km/h) between King’s Cross and Bradford. It was hauled by Gresley ‘A4’ No. 4492 ‘Dominion of New Zealand’, which had emerged from Doncaster Works only three months earlier.

Services were suspended for the duration of the Second World War, but were reinstated in 1949. A modern version of the train is still operated by the present-day LNER with a 6.30am departure from Bradford Forster Square station.

The carriages are in pairs, sharing a bogie between the two. Coaches ‘A’ and ‘B’ in the eight-coach rake include an open third brake with accommodation for the guard, and a coach with a further third class area plus kitchen. Those are the highly detailed OO gauge model coaches shown in this pack.

Name:
R40477 Hornby LNER West Riding Limited Brake Third & Kitchen Thi
Gauge:
OO Gauge
Price:
£ 134.99 Saving £15.00 (10.00%) on RRP (£149.99)
Product Code:
GLQ001
Availability:
In Stock - usually despatched within 24 hours
Stock Level:
20
Brands
None Deliverable