WORLDWIDE SHIPPING!  OPENING HOURS: MON - SAT 10AM to 4.30PM / 10AM to 4PM SUN & Bank Holidays
For our Christmas opening hours and last posting dates click here 
Choose a category...
Welcome to Kernow Model Rail Centre  /   Call our team on 01209 714099 for all enquiries & orders  /   Post Free UK Orders over £250. More details >>>

0 x item(s)

18 selected products
  • GM449 Gaugemaster Fordhampton Industrial Chimney Kit
  • 4D-022-026 Dapol Class 68 Diesel - 68 033 The Poppy - DRS
  • 34-761A Bachmann SR Bulleid Brake Composite Corridor BR Green
  • R30422 WSL Hornby Dublo LNER A4 Dominion of New Zealand 4492
  • GR400A Peco Lynton and Barnstaple Composite Coach number 5
  • 372-063SF Graham Farish MR 3835 4F 4057 LMS Black
  • 38-042B Bachmann BR OBA Open Wagon Plasmor Blockfreight
  • ATD12014 ATD Models 1970s Office Block Card Kit
  • 50119 ESU ECoS Power Supply 15-21VDC 7A 150VA Output
  • ACC3080 Accurascale Clayhood - 13T - Unfitted - Pack B
  • 2L-003-004 Dapol Motorised Semaphore Signal - SR Distant
  • 47353 Vollmer N Clay or cement tile roof plastic sheet 149x109m
  • 07075 Noch Static Apline Meadow Grass 50g
  • 37029 Kibri N Alpine chalets Sertig (2 pcs.)
  • K50010 Nameplate Monarch 2 nameplates made by Shawplan for KMRC
  • ST17 Peco Setrack 3rd Radius Double Curve
  • PL8 Peco Motor Mounting Plate for Peco G Scale Points
  • R40037B WSL Hornby Mk3 Trailer Standard Coach E number 42013
R40037B R40037B
Click an image to enlarge.

R40037B WSL Hornby Mk3 Trailer Standard Coach E number 42013

Add To Comparison

R40037B Hornby Mk3 Trailer Standard Coach E number 42013 in First Great Western livery - Era 10.

In-order to allow running at 125 mph on Britain’s Victorian era railways, new rolling stock was needed by British Railways. Significant improvements over the Mk2 included new secondary air suspension between the bogies and the coach body as well as aerodynamic skirting on the underframe. Mk3 coaches are 75ft (23m) long enabling far greater capacity than older coaches. Mk3 coaches also incorporate disk breaks and wheel slip protection enabling faster deceleration.

The first Mk3 coaches to be delivered were used as part of the HST prototype along with the two Class 41 diesel power cars in 1972. Mk3 coaches entered service in 1975 along with the Class 43 forming the iconic InterCity 125 trainset.

After the HST Mk3 coach variant was introduced, further Mk3 coaches were introduced to the West Coast Mainline for use as part of locomotive hauled trains. Whilst Mk3 stock is standard for HST units, the standard locomotive hauled stock is Mk3a. Mk3a stock differs from Mk3 stock due to the inclusion of buffers as well as a different electrical system that uses motor generator units in each coach to power air conditioning and other ancillaries Mk3a stock was built until 1984, before 3B stock with improved seating and lighting was built from 1985 to 1988.

In 1996, as a result of the privatisation of British Rail, The InterCity Great Western franchise was awarded to Great Western Trains who in 1998 became First Great Western (FGW). FGW operated Mk3 coaches in HST car-sets from London Paddington to various locations in the west, south wales and south-west. FGW was rebranded as Great Western Railways in September 2015 and in 2017 started to replace its InterCity 125 sets with new Hitachi Class 800 and 802 sets.

Name:
R40037B WSL Hornby Mk3 Trailer Standard Coach E number 42013
Gauge:
OO Gauge
Price:
£ 29.99 Saving £15.00 (33.34%) on RRP (£44.99)
Product Code:
THF032
Availability:
Temporarily out of stock - usually despatched within 28 days
Stock Level:
0
Brands
None Deliverable