WORLDWIDE SHIPPING!  OPENING HOURS: MON - SAT 10AM to 4.30PM / 10AM to 4PM SUN & Bank Holidays
Choose a category...
Welcome to Kernow Model Rail Centre  /   Call our team on 01209 714099 for all enquiries & orders  /   Post Free UK Orders over £250. More details >>>

0 x item(s)

23 selected products
  • 35-901 WSL Bachmann Class 08 D3785 BR Green (Late Crest)
  • 35-823 Bachmann Class 31/1 Refurbished 31319 BR Railfreight
  • R40151 WSL Hornby Mk4 Open Standard Coach E number 12404 in LNER
  • 35-302SF Bachmann Class 37/0 Split Headcode D6710 BR Green
  • PL31 Peco Lectrics Push-on Terminal Connectors and Shrouds
  • 35-306SF WSL Bachmann Class 37/0 Diesel Loco D6829 BR Green
  • PL37 Peco Cable Clips
  • 35-805SF Bachmann Class 31/1 Diesel Locomotive 31 123 BR Blue
  • 35-431 Bachmann Class 47/4 Diesel 47 826 WCRC Maroon
  • 35-821SFX Bachmann Class 31/1 Refurbished 31180 BR Railfreight
  • GM81 Gaugemaster Light Emitting Diode
  • 35-946SF WSL Bachmann Class 13 Diesel number 13 003 - BR Blue
  • 35-335Z Bachmann Class 37 Diesel 37 418 An Comunn Gaidhealach
  • 35-906 WSL Bachmann Class 08 08928 BR Railfreight (Red Stripe)
  • 35-429SFX Bachmann Class 47/7 Diesel 47 791 VSOE Res
  • GMC-M2 Gaugemaster Mains Transformer
  • R8212 Hornby Rolling Road Additional Rollers
  • 302 Ratio Coarse Stone
  • GM15 Gaugemaster Ring Terminals (6)
  • 35-353 WSL Bachmann Class 20/0 Headcode Box D8133 BR Green
  • 309 Ratio Industrial Windows
  • 44875 Bachmann Nickel Silver 6 Single Crossover Turnout
  • R4888D WSL Hornby 59ft Bulleid Corridor Brake 3rd Class Coach
R4888D Hornby 59ft Bulleid Corridor Brake 3rd Class Coach number S2849S in BR SR Green livery - Era 4 R4888D Hornby 59ft Bulleid Corridor Brake 3rd Class Coach number S2849S in BR SR Green livery - Era 4
Click an image to enlarge.

R4888D WSL Hornby 59ft Bulleid Corridor Brake 3rd Class Coach

Add To Comparison

R4888D Hornby 59ft Bulleid Corridor Brake 3rd Class Coach number S2849S in BR SR Green livery - Era 4.
Set 967

When Oliver Bulleid took over as Chief Mechanical Officer of the Southern Railway following Richard Maunsell's retirement, the General Manager and Board were already aware that the SR's mainline coaching stock lagged behind the standards set by the other three Railway companies.

In 1938, with the assistance of his Technical Assistant, L. Lynes, Bulleid began design work for new steam-hauled stock for the Bournemouth and Weymouth services, placing the order for fifty-four 57' 11" underframes with Lancing Works. With the onset of the Second World War, the supply of bodies for these was put on hold and it was not until 1944 before the orders for the bodies could be placed, the first of these being finished at Eastleigh Works in November 1945.

Featuring a smooth, continuously curved bodyside, with small fixed windows above the door windows, the exterior was distinctly Bulleid in character and was a perfect match for his streamlined Pacifics and Light Pacifics. However, the interim nature of the design was apparent in the retention of Maunsell's underframe and layout, with side doors providing access to each compartment. Two types of stock were built; a Composite of four First, and three Third Class compartments to Diag. 2316 and a Brake Third of five compartments, with a 22' long brake van to Diag, 2121.

The last coaches were withdrawn in July 1967, at the end of Southern steam. The first withdrawals started in December 1963, leaving just Sets 964/967/968/976 and 980 until 1965, when further withdrawals left just twenty loose coaches.

Name:
R4888D WSL Hornby 59ft Bulleid Corridor Brake 3rd Class Coach
Gauge:
OO Gauge
Price:
£ 17.99 Saving £42.50 (70.26%) on RRP (£60.49)
Product Code:
THF196
Availability:
In Stock - usually despatched within 24 hours
Stock Level:
42
Brands
None Deliverable