WORLDWIDE SHIPPING!  OPENING HOURS: MON - SAT 0930 to 1700 / 1000 to 1600 SUN & Bank Holidays

Choose a category...
Welcome to Kernow Model Rail Centre  /   Call our team on 01209 714099 for all enquiries & orders  /   Post Free UK Orders over £250. More details >>>

0 x item(s)

10 selected products
  • R30176TXS WSL Hornby Railroad Plus GBRf 73109 Battle of Britain
  • TT4059 Hornby BR 4 Wheel Coach 1st Class
  • R60264 WSL Hornby BR Railfreight, 45T VDA Van, 21027 - Era 7
  • R8003 Hornby Water Tower
  • R1286M Hornby Freight Runner Train Set
  • TT4022 Hornby Mk2F Brake Standard Open BSO Coach number 9533
  • R40182B Hornby Mk3 Trailer First - 11075 - RCS - Coach C
  • R7350 Hornby Skaledale Victorian End of Terrace House Left End
  • TT4001A Hornby BR Mk1 Composite Corridor E15468 - Era 5
  • R628 Hornby Curve
TT4001A Hornby BR Mk1 Corridor Composite Coach number E15468 in BR Maroon - Era 5 TT4001A Hornby BR Mk1 Corridor Composite Coach number E15468 in BR Maroon - Era 5
Click an image to enlarge.

TT4001A Hornby BR Mk1 Composite Corridor E15468 - Era 5

Add To Comparison

TT4001A Hornby BR Mk1 Corridor Composite Coach number E15468 in BR Maroon - Era 5

Upon nationalisation in 1947 the newly formed British Railways saw the need to standardise their passenger stock, having inherited a patchwork of coaches of all different specifications from each of the big four who were in turn sometimes running a wide variety of stock from their constituent companies. This new coach would have to be perfect for every possible use that the new BR may need it for, which could be tricky when the coach would need to be used on high speed summer boat trains in the south and cold winter services in the north of Scotland.

These coaches would be constructed from 1951 to 1963 with only one significant change made during this time, a swapping of bogies in the last gasps of the Mark 1s build cycle. The Mark 1 coach as it would be designated was designed to be a ‘go anywhere, do anything’ coach utilising the best features from each of the big four coaches the company had inherited. The Mark One coaches were stronger than the designs they replaced, with their introduction being commended in rail safety reports. These coaches would be in stock in one form or another in the UK until 2010, when the Mark One based Class 421 was withdrawn from service on the Lymington Branch Line

Name:
TT4001A Hornby BR Mk1 Composite Corridor E15468 - Era 5
Gauge:
TT Gauge
Price:
£ 37.99 Saving £4.00 (9.53%) on RRP (£41.99)
Product Code:
UDD001
Availability:
Temporarily out of stock - usually despatched within 28 days
Stock Level:
0
Brands
None Deliverable