Dapol MRA Ballast Wagon Network Rail Yellow
Order before 2pm and choose Next Day shipping option to receive your order ASAP
Need any product help?
New release - pre-orders invited - expected during 3rd Quarter 2025.
Image is of previous release and will be updated dreckly
MRA History
The MRA side tipping ballast wagon ran in fixed rakes of five wagons, one of which was fitted with a generator to provide power and air for the whole set. Each wagon had two shallow boxes which could be tipped to either side, discharging ballast onto parallel track beds. The first batch of 300 wagons (60 sets) was made by Thrall Europa in York between 2000 and 2002 and was liveried in cream and blue of Railtrack. A second batch of 100 wagons (20 sets) was made by Trinity Rail in Romania in 2004 and brand in yellow Engineers livery of Network Rail. in 2006 five sets were transferred to GB Railfreight to work on its Metrnet track removal contract. From 2023 a program to convert a significant portion of the MRA fleet into JNA-Y wagons has been undertaken
The Dapol model of the MRA Ballast wagon will feature:
- Finely detailed moulded body
- Opening ballast doors
- NEM pockets at outer most ends of the rake
- Magnetic inter-car coupling systemHeavy diecast components to enhance smooth running performance
- Profiled wheels
- Accurately applied liveries
New release - pre-orders invited - expected during 3rd Quarter 2025.